Before We Start

When undertaking an electric installation process, the member is responsible for supplying the following components and completing the final site restoration.

Service Size <320 Amp

  • Meter base & or disconnect(s)
  • Conduit system installed in the ground
  • Concrete transformer pad (if applicable)

Service Size >320 Amp

  • CT Cabinet (with Polaris lugs for each conductor)
  • Conduit system installed in the ground
  • Concrete transformer pad(s)
  • Secondary/Service wire(s)
  • 2 Bolt compression fittings installed (if applicable)