Note: Failure to mark the desired location of service may result in job delays and/or additional charges.
- Stake all facilities.
- Upon request, a field engineer will meet with you on-site to discuss options.
- Next, we will perform a site visit and design the most economical route for electric service installation, place stakes marking the proposed route, and determine members cost as well as other responsibilities.
- Major changes to this design may result in job delays and extra fees.
Member Checklist
During the design-phase, reference this checklist to ensure you have all the information you need.
- Mark your proposed meter location.
- Please stake all facilities. These Include:
- Property lines
- The 4 corners of the home and other proposed buildings
- Underground member-owned facilities (well, septic, water lines, propane lines, sprinklers, dog fence, etc.)