Step 2: Meet with the Field Engineer

Buildings and property lines must be staked prior to any meeting in the field with an engineer. During the meeting in the field, customers must provide the engineer a copy of the deed or survey and, for a home or business, a well/septic permit if applicable. The engineer will provide a copy of “Consumer Procedures for Obtaining Service,” which is a new service initial checklist that the consumer should follow.

The engineer will cover a number of items during the meeting including:

  • Service routes/Meter locations
  • Easements
  • Tree trimming
  • Consumer responsibilities
  • Temporary construction